SJRMC - Pavillion II

SJRMC - Pavillion II
South Bend, IN

Type of Work: Remodel / Addition
Building Area: Addition - 1,800 SF Remodel – 8,500 sf
Project Duration: 6 Months
Project Duration: 6 Months
Scope of Work: Designer and General Contractor
Project Description:
SJRMC hired Forsey Construction to develop a Cancer Treatment Center in Pavilion II. The main floor amenities included a translucent covered entrance canopy, waiting area with internet access, a chapel and beauty salon. In the lower level, a conference / office area was developed.

  • SJRMC - Pavillion II

    SJRMC - Pavillion II
    South Bend, IN

    Type of Work: Remodel / Addition
    Building Area: Addition - 1,800 SF Remodel – 8,500 sf
    Project Duration: 6 Months
    Project Duration: 6 Months
    Scope of Work: Designer and General Contractor
    Project Description:
    SJRMC hired Forsey Construction to develop a Cancer Treatment Center in Pavilion II. The main floor amenities included a translucent covered entrance canopy, waiting area with internet access, a chapel and beauty salon. In the lower level, a conference / office area was developed.

  • Cassopolis Family Center

    Cassopolis Family Center
    Cassopolis, MI

    Type of Work: Interior Remodel
    Building Area: 1,000 SF
    Project Duration: 4 weeks
    Scope of Work: Designer and General Contractor
    Project Description:
    Project phasing was the key to success in this project. Phase one was to demolish an old x-ray room and build a new phlebotomy lab. The owner moved into the new lab allowing us to start phase two, which was to demolish the old lab and construct a patient services office. Phase three was to remodel their waiting room. All work was done “after hours” to minimize patient inconvenience. Other projects at the facility included replacing several windows and reglazing a curtain wall system.

  • South Bend Clinic Cancer Center

    South Bend Clinic Cancer Center
    South Bend, IN

    Type of Work: E.I.F.S. (Exterior Insulation and Finish System)
    Building Area: 8,000 SF
    Project Duration: 5 months
    Scope of Work: Sub-Contractor
    Project Description:
    Forsey Construction was hired to install all of the E.I.F.S. on the exterior of the building. This included the underside of the patient drop off canopy as well as the roof top mechanical penthouse.

  • SJRMC - Northwest Family Medicine

    SJRMC - Northwest Family Medicine
    South Bend, IN

    Type of Work: Interior Remodeling
    Building Area: 9,000 SF
    Project Duration: 3 months
    Scope of Work: Designer and General Contractor
    Project Description:
    Saint Joseph Regional Medical Center bought the old Sobieski Bank headquarters building for Northwest Family Medicine to occupy. We had to convert 15 loan offices into exam rooms, create one procedure room from a conference room and another procedure room from an open office area. The teller line became the check-in and check-out area. The major obstacle was to get plumbing to all of those rooms with a minimal disruption to existing finishes and there was no basement.